Design and Construction of Concrete Formwork



Design and Construction of Concrete Formwork


Concrete formwork serves as a mold to produce concrete elements having a desired size and configuration. It is usually erected for this purpose and then removed after the concrete has cured to a satisfactory strength. In some cases, concrete forms may be left in place to become part of the permanent structure.
For satisfactory performance, formwork must be adequately strong and stiff to carry the loads produced by the concrete, the workers placing and finishing the concrete, and any equipment or materials supported by the forms. For many concrete structures, the largest single component of the cost is the formwork. To control this cost, it is important to select and use concrete forms that are well suited for the job. In addition to being economical, formwork must also be constructed with sufficient quality to produce a finished concrete element that meets job specifications for size, position, and finish. The forms must also be designed, constructed, and used so that all safety regulations are met.


Formwork costs can exceed 50% of the total cost of the concrete structure, and formwork cost savings should ideally begin with the architect and engineer. They should choose the sizes and shapes of the
elements of the structure, after considering the forming requirements and formwork costs, in addition
to the usual design requirements of appearance and strength. Keeping constant dimensions from floor to floor, using dimensions that match standard material sizes, and avoiding complex shapes for elements in order to save concrete are some examples of how the architect and structural engineer can reduce forming costs.

3 comments:

  1. I've heard that concrete formwork can be very complex. Thanks for being so detailed and specific. I really appreciate all of the notes.

    ReplyDelete
  2. Hey.. you really defined well for "deflection process". This blog is perfect one to educate the masses.

    ReplyDelete
  3. Its really nice information, and very informative for me. It is usually erected for this purpose and then removed after the concrete has cured to a satisfactory strength. Nice blog!

    concrete staining washington dc

    ReplyDelete